T12 defined the required structural steelwork modification scope to support the installation of access hatches and platforms, to allow maintenance works to the interior of silos.
These upgrades were necessary to mitigate the risks associated with the previous silo access methodology, improving safety, and saving time during maintenance works.
T12 performed site surveys and design and from there supported during fabrication, construction and Installation.
T12 worked in collaboration with the client to ensure all requirements were met.